Welcome to deck fantasy camp.

Design the deck that fits how you actually live: the grill by the kitchen door, a table for eight, a lounge chair in the afternoon sun, maybe a hot tub up top. Drag the edges, pick the boards and railings, then walk around it in 3D. It's free, it's fun, and you don't need an account to play.

Design your deck

Drag the handles, move the stairs, pin notes. No account needed.

Start with a shape

Pick the one closest to your deck. You can change it, and every size, any time.

Or start from a template

Sketch it, then send it to us.

  • Sketch your deck in a few minutes: shape, size, height, stairs, boards and railings. Then walk around it in 3D.
  • Request a proposal. Your design comes to us with its plan and materials list, so the first conversation is about your deck, not guesswork.
  • We visit to check the ground, your house wall and access, then send you a firm price.
Design your deck

We’ve made every effort to follow the building code and the published deck guides, but every property is different. Every design is subject to review by an engineer and by us before we build, and your building department has the final word.

From sketch to built deck in four steps.

  1. Design the deck

    Sketch it, place the stairs, pin notes. Framing and permit guidance update as you go.

  2. Request a proposal

    Add your address and how to reach you. Your design and notes come straight to us.

  3. We visit and price it

    We check the ground, the house wall and access, adjust the plan where your yard needs it, and send a firm proposal.

  4. We build it

    We handle the permit and the drawings for it, then build the deck you designed.

Permit rules change at the county line.

Colorado has no statewide contractor license, so each city and county sets its own rules for decks and for who may build them. Here's where each county starts.

City and County of Denver

  • Zoning permit for uncovered decks 12 in or higher
  • Building permit at 30 in
  • Covered decks need both

Unincorporated Boulder County

  • Permit over 200 sq ft, if attached, or 30 in and higher
  • Most decks need stamped engineering
  • Footings at least 30 in deep

Unincorporated Adams County

  • Permit over 30 in
  • Any deck with a roof needs a permit

Unincorporated Jefferson County

  • Common thresholds: attached, over 30 in, or over 200 sq ft
  • Foothill lots often need engineering

Unincorporated Douglas County

  • Common thresholds: attached, over 30 in, or over 200 sq ft
  • Contractors must be listed when the permit is submitted
  • Many homes are in HOAs: get approval first

Unincorporated Arapahoe County

  • Common thresholds: attached, over 30 in, or over 200 sq ft
  • Most residents live in Aurora, Centennial, Littleton or Englewood, which run their own permits

Read the full permit guide, with links to each county's rules

Planning a deck?

Sketch it in about fifteen minutes, then request a proposal.

Design your deck